Commencement notices — Glasnevin

Glasnevin, Dublin

4 unique commencement events · latest notified commencement 23 Mar 2026 · planning basis not stated

View full project timeline

Unique commencement events
4
Latest notified commencement
23 Mar 2026
Latest notice
24 m²
Planning references supplied
None stated
Public location
Glasnevin, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Glasnevin, Dublin
County
Dublin

Notice location variants

  • Dublin Industrial Estate, Dublin 11, Dublin CN0139719DC
  • Dublin, Dublin SN0013431DC, SN0013430DC
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0139719DC BCMS open-data feed

ESB Substation, Lidl Glasnevin

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 24 m².

CN0138851DC BCMS owner-supplied export

The construction of a replacement, single storey, discount foodstore with ancillary off license sales area. This will have a gross floor area of 2,496sqms and will include an external, covered, trolley bay and secure cycle parking.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,674 m².

Builder stated: Mc Callion Construction Ltd
SN0013431DC BCMS open-data feed

Proposed development of a single storey stand alone structure for use as a cafe (Block B) with gross floor area circa 122m2. To be constructed on the same site as a stand alone Lidl discount food store(Block A), and a gym (Block C).

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 122 m².

SN0013430DC BCMS open-data feed

Proposed development of a stand alone two storey structure for use as a gym (Block C), with gross floor area circa 431m2. To be constructed on the same site as a Lidl discount food store (Block A) and a cafe (Block B).

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 431 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.