Site start · Co. Dublin
Glasnevin, Dublin
Granted 8 Jul 2022 (final grant issued 29 Aug 2022)
Key facts
- Site start record 3903/21 at Glasnevin, Co. Dublin: Proposed development involves the demolition of all existing…
- The planning authority is Dublin City Council.
- Status: Granted 8 Jul 2022 (final grant issued 29 Aug 2022).
Source: the Dublin City Council planning register, as last seen on 12 Jul 2026. Search the council's register
More planning applications in Glasnevin · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 8 Jul 2022.
Search the Dublin City planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
Proposed development involves the demolition of all existing…
The development consists of: The proposed development involves the demolition of all existing structures and development of a mixed use development on a site of 1.12 hectares and includes: Demolition of the existing foodstore and offices and retail unit, ESB substation and also the former petrol station, car wash and associated structures. Block A: the construction of a replacement, single storey, discount foodstore with ancillary off license sales area. This will have a gross floor area of 2,496sqms and will include an external, covered, trolley bay and secure cycle parking. Block B: single storey structure for use as either retail or cafe and gross floor area of 122sqms; Block C: two storey structure for retail or gym and a gross floor area of 431sqms. A new, ramped, pedestrian access from the Finglas Road and a new pedestrian access to the Slaney Road near the proposed Block B. Revised access arrangements to service the overall development with a left in/left out arrangement on the Finglas Road. The existing access to the existing foodstore on Slaney Road would continue to be used to service the development. Provision is also made for the BusConnects plans associated with the bus stop next to the proposed Block C. All signage on the proposed foodstore and 1 ''flagpole'' sign on the Finglas Road and 1''flagpole'' sign on the Slaney Road entrance. 128 car parking spaces in total including 5 accessible spaces, 6 parent and child and 2 electric vehicle (EV) charging spaces. Circa. 20% of overall spaces will be wired for future EV spaces. New ESB substation; Photovoltaic panels on the roof of the proposed foodstore. Relocation of existing billboard sign (located in existing LIDL car park) to a point next to Block C. All hard and soft landscaping, drainage and associated works. All other ancillary works to complete the development.
- Location
- Glasnevin, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3903/21
- Application type
- Commencement Notice
- Agent named on the notice
- Mc Callion Construction Ltd
Numbers and dates
- Floor area
- 2,674 m²
- Project type
- Infrastructure
- Received
- 19 Nov 2021
- Decision to grant
- 8 Jul 2022
- Final grant
- 29 Aug 2022
- Site start notified
- 1 Dec 2025
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 3903/21.Search the register
- AppealAppeal withdrawn · 314269 / 22 Aug 2022View the appeal record
How we know this
From the Dublin City Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 1 Dec 2025Notice filed · phase 1 · Proposed development of a stand alone two storey structure for use as a gym (Block C)...View the site start
- 1 Dec 2025Notice filed · phase 2 · Proposed development of a single storey stand alone structure for use as a cafe...View the site start
- 25 Feb 2026Notice filed · phase 3 · The construction of a replacement, single storey, discount foodstore with ancillary off...View the site start
- 23 Mar 2026Notice filed · phase 4 · ESB Substation, Lidl GlasnevinView the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area