Site start
Housing site start — Drumree
Drumree, Meath
1 commencement notice · start date 14 Sep 2026 · planning reference given
Planning 2660324 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 14 Sep 2026
- Latest notice
- 1 house
- Planning reference
- 26/60324
- Location
- Drumree, Meath
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 26/60324 Meath County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Drumree, Meath
- County
- Meath
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Meath County Council planning record Application details, status and decision record for 26/60324. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
a) removal of front porch, and b) construction of a new extension to front of existing dwelling, c) change of material finish to existing dwelling, d) construction of a single storey extension to side and rear of dwelling, e) widening and splaying of existing 2no vehicular entrances to provide safer access, f) new detached shed to rear garden, g) installation of a proprietary sewage treatment system and percolation area, and all associated site works.
Floor area stated for this source: 333 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.