Commencement notice group
Building extension commencement notices — Fethard
Fethard, Tipperary
1 unique commencement event · latest notified commencement 04 Oct 2024 · planning reference supplied
- Unique commencement events
- 1 2 public source rows · 1 duplicate representation consolidated
- Latest notified commencement
- 04 Oct 2024
- Latest notice
- 3,650 m²
- Planning references supplied
- 2260121
- Public location
- Fethard, Tipperary
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 2260121 Tipperary County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Fethard, Tipperary
- County
- Tipperary
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Tipperary County Council planning record Application details, status and decision record for 2260121. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. 1 duplicate source representation is consolidated under the canonical notice reference while every source remains visible beneath that event.
Reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility. Increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility. Air handling bio-filter installation and associated extract and input fans. All necessary site works.
Floor area stated for this source: 3,650 m².
- Historical commencement notice Notified commencement: 2024-10-04 Source checked: 2026-10-05T03:03:13Z Floor area stated in this source representation: 3,650 m² Open source record
- Commencement notice Notified commencement: 2024-10-04 Source checked: 2026-06-09T15:11:14Z Floor area stated in this source representation: 3,650 m² Open source record
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.