Site start
Housing site start — Carrick-On-Suir
Carrick-On-Suir, Tipperary
2 commencement notices · latest start date 28 Mar 2024 · planning reference given
Planning 21714 · Planning application · Council file · external
- Commencement notices
- 2
- Latest start date
- 28 Mar 2024
- Latest notice
- 272 m²
- Planning reference
- 21714
- Location
- Carrick-On-Suir, Tipperary
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 21714 Tipperary County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Carrick-On-Suir, Tipperary
- County
- Tipperary
Addresses on the notices
- Pallas Cross, Tipperary
- Notice source points are up to 56.2 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 52.730036, -7.974341 Open point
- Public notice source · 52.349317, -7.427434 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Tipperary County Council planning record Application details, status and decision record for 21714. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
part two-storey (dormer)/part single story dwelling with new treatment system, percolation area, new entrance from public road and associated site works
Floor area stated for this source: 272 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
The change of use of part of the existing single storey flat roof garage/store to an ensuite bedroom. Proposed works involve a new flat roof to the existing garage/store & alterations to existing window & door opes
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.