Site start
University College Dublin campus — site start
Dublin 4, Dublin
3 commencement notices · latest start date 10 Nov 2021 · planning reference given
Planning D20A/0030 · Planning application
- Commencement notices
- 3
- Latest start date
- 10 Nov 2021
- Latest notice
- 275 m²
- Planning reference
- D20A/0030
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
Addresses on the notices
- Dublin
- Belfield to clear the site for future development of buildings (which will be subject to future commencement notices)
- Notice source points are up to 624 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.306464, -6.225488 Open point
- Public notice source · 53.306464, -6.225488 Open point
- Public notice source · 53.309181, -6.233707 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of a Single Story MEP Plant Building.
Floor area stated for this source: 275 m².
The construction of a Single Story MV Plant Building.
Floor area stated for this source: 102 m².
This Short Form Commencement Notice relates to Site Works associated with the Landscaping and Infrastructure Enabling works being delivered as part of the Future Campus Phase 1 project and comprises the following: - Modifications to the existing entrance arrangement to the University College Dublin campus at Belfield to clear the site for future development of buildings (which will be subject to future commencement notices). - New underground services installations and diversion works. - Diversion and reconfiguration of the existing internal road network within the application boundary and provision of 1 no. roundabout providing vehicular access/egress to/from the existing car park (at the north eastern boundary of the site), the reconfigured Engineering car park and Belfield House. - Hard and soft landscaping works, including the removal of existing trees, landscaping boundary treatments, campus lighting etc. - Demolition of the following buildings and structures: a. security hut/entrance booth (c.40 sqm) located at the main campus entrance. b. The single storey Campus Bank building (c.340 sqm). c. The existing Mechanical Electrical Plant (MEP)/services plant area (with a combined area of c. 96.5 sqm) and all associated external apparatus generally to the south west of the existing Engineering and Materials Science Centre. d. The removal of the existing entrance gates and associated elements. e. The making good and levelling of ground following removal of buildings/plant (as necessary) and all associated temporary landscaping measures. - All associated ancillary elements including associated ancillary plant, site services, all associated drainage works (including provision of attenuation tanks and SuDs measures) and all associated site development works. No internal space or building is proposed under this notice. This is the second part of a larger permission associated with the Landscaping Infrastructure Enabling Works as part of the Future Campus Phase 1 Proposa
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.