Site start
Commercial site start — Ballymore Eustace
Ballymore Eustace, Kildare
1 commencement notice · start date 26 Feb 2018 · planning reference given
Planning 17/858 · Council file · external
- Commencement notices
- 1
- Latest start date
- 26 Feb 2018
- Latest notice
- 1 unit
- Planning reference
- 17/858
- Location
- Ballymore Eustace, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 17/858 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Ballymore Eustace, Kildare
- County
- Kildare
Addresses on the notices
- ground floor and an office space over one half section at first floor
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 17/858. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
To construct an equine breeding centre and farm yard buildings. The development will consist of 4 no. Blocks arranged around a central courtyard. Block 1 will consist of a covered horse walker and lunge ring. Block 2 will consist of 14 no. Stables with wash bay, vet room, tack room and hay/feed store at ground floor and an office space over one half section at first floor. Block 3 will consist of 6 no. stables to one side with cattle shed to the other with overhang roof. Block 4 will consist of a hay store and machinery storage barn. Permission also sought for:- (a) to construct a covered muck heap storage area. (b) to construct an underground soiled water holding tank. (c) a secondary effluent treatment system with a sand filter percolation area to serve the proposed facility. (d) to relocate and upgrade the existing farm entrance approx. 12m to the north of its existing location for the purpose of improving sight lines. (e) lay an access roadway from the public road to the farm yard which is located immediately after the existing stream which traverses the land. (f) to carry out land drainage work on the field adjacent to the roadway by the laying of a 225 pipe diameter from the proposed new entrance to the stream with herring bone minor drains feeding into main drain
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.