Commencement notice group
Housing commencement notices — Monkstown
Monkstown, Co Dublin, Dublin
3 unique commencement events · latest notified commencement 03 Feb 2017 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 03 Feb 2017
- Latest notice
- 2 units
- Planning references supplied
- D15A/0347
- Public location
- Monkstown, Co Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Monkstown, Co Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Monkstown Co.Dublin, Dublin
- Monkstown Co. Dublin, Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of a three storey residential building comprising a single storey apartment unit (unit no. 22) located on the ground floor and a two storey apartment unit (unit no.21) located on the first and second floor accessed from the ground floor via a single stair. Block D is a part of a larger development on the site commenced under a separate notice.
The construction of a three storey residential building comprising a single storey apartment unit (unit no. 23) located on the ground floor and a two storey apartment unit (unit no.24) located on the first and second floor accessed from the ground floor via a single stair. Block C is a part of a larger development on the site commenced under a separate notice.
The erection of 29 no. 3 storey dwellings comprising Block A with 16 no. 6 beds dwellings, Block B with 1no. 4 beds dwellings and 2 no. 3 beds dwellings, Block C with 1 no. 1 bed dwelling, 1 no. 1bed +study room dwelling, 2 no. 3 beds dwellings, Block D with 1 no. 1 bed dwelling, 1 no. 1bed +study room dwelling, 2 no. 4 beds dwellings, Block E with 4 no. 4 beds dwellings and associated development works including the demolition of the existing factory and re-location of existing ESB sub-station. The erection of 29 no. dwellings and associated development works are to be carried out in 6 no. phases/sequences: Phase 1- Block B (units 27, 28, 29) and part of Block A (units 1, 2, 3); Phase 2-Block C (units 23, 24, 25, 26) and part of Block A (u nits 4, 5, 6; Phase 3-part of Block A (units 7, 8, 9); Phase 4-Block D (units 20, 21, 22) part of Block E (units 18, 19) and part of Block A (units 10, 11, 12); Phase 5-part of Block E (units 16, 17) and part of Block A (units 13, 14, 15); Phase 5-associated development works including play spaces. The site for this development is located at the rear of nos. 25-35 and between and to rear of 37-40 Abbey Road, Monkstown, Co Dublin.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.