Site start
Grangecastle Business Park — site start
Dublin 22, Dublin
3 commencement notices · latest start date 21 Sep 2022 · planning reference given
Planning SD18A/0323 · Planning application · Council file · external
- Commencement notices
- 3
- Latest start date
- 21 Sep 2022
- Latest notice
- 63 m²
- Planning reference
- SD18A/0323
- Location
- Grange Castle Business Park, Nangor Road, Dublin 22
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 3
- Open exact official planning record: SD18A/0323 South Dublin County Council
- Partial completion certificate recorded South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-06 1 units stated for this certificate · One certificate representation
- Partial completion certificate recorded South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-06 1 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-09 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Reviewed planning, commencement and document evidence
Exact project story for SD18A/0323 under South Dublin County Council, retaining 3 separate commencement identities.
- Commencement identities
- 3 retained separately
- Latest group date
- 2022-09-21 not assigned across events
- Maximum on one notice
- Not stated never summed
- Reviewed index
- 0 0 exact document links
- Permitted scale
- 7380 m² permission record; not summed with notices
Planning and appeal references
- Planning_Application SD18A/0323 Open exact official record
Every retained commencement event
- 2022-03-28 Commencement notice 7246 m² on this event
- 2022-06-07 Commencement notice 7246 m² on this event
- 2022-09-21 Commencement notice 63 m² on this event
Exact organisation roles
- South Dublin County CouncilPlanningauthority · Exact official planning record SD18A/0323.
Explicit facts with official citations
Each statement keeps its exact reference, official title or drawing-title locator, and review state.
- Planningoutcome Planning outcome recorded as GRANT PERMISSION. SD18A/0323 · Official planning record — SD18A/0323 · Decision field · exactauthorityreferencerecord Open official evidence
- Permittedscale Permitted scale record states 7,380 m² floor area. SD18A/0323 · Official planning record — SD18A/0323 · Residential units and floor-area fields · exactauthorityreferencerecord Open official evidence
Location
Where the site is
- Area
- Dublin 22, Dublin
- County
- Dublin
Addresses on the notices
- Grange Castle Business Park, Nangor Road, Dublin 22
- Notice source points are up to 612 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.328059, -6.434138 Open point
- Public notice source · 53.328059, -6.434138 Open point
- Public notice source · 53.329648, -6.442956 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD18A/0323. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed ESB Substation on the site of a Data Centre (Interxion IX DUB4) at Grangecastle Business Park, Clondalkin, Co. Dublin. The ESB Sub station is a single storey typical ESB Substation divided into two areas, An ESB room and a customer switch room. The proposed ESB substation will be adjacent to, and connected to the existing ESB Substation.
Floor area stated for this source: 63 m².
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at roof level, that includes a reception area (274.4sq.m), shipping area (264.3sq.m) and three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at ground floor; storage (476sq.m) at mezzanine level above the shipping area; and office (560sq.m), three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at first floor level; and service spine at second floor level only. The new data centre will include plant at roof level; associated support services, 7 standby generators with associated flues (each 17.29m high). These generator units provide back up power to the data halls. An external steel gantry and access stairs is provided to the external generators for inspection and maintenance of the upper level. The proposed facility is to be located within the Grange Castle Business Park and access to the site will be from the existing roads within the business park. Refer to site plan for further details. The proposed building (to be called IX Dub04) is very similar to that previously approved for the IX DUB03 data centre building, also applied for by the same applicant, Interxion Ireland and the new data centre shall be on the same site as IX DUB03, and under the same ownership.
Floor area stated for this source: 7,246 m².
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at roof level, that includes a reception area (274.4sq.m), shipping area (264.3sq.m) and three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at ground floor; storage (476sq.m) at mezzanine level above the shipping area; and office (560sq.m), three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at first floor level; and service spine at second floor level only. The new data centre will include plant at roof level; associated support services, 7 standby generators with associated flues (each 17.29m high). These generator units provide back up power to the data halls. An external steel gantry and access stairs is provided to the external generators for inspection and maintenance of the upper level. The proposed facility is to be located within the Grange Castle Business Park and access to the site will be from the existing roads within the business park. Refer to site plan for further details. The proposed building (to be called IX Dub04) is very similar to that previously approved for the IX DUB03 data centre building, also applied for by the same applicant, Interxion Ireland and the new data centre shall be on the same site as IX DUB03, and under the same ownership.
Floor area stated for this source: 7,246 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.