Commencement notice group
Grangecastle Business Park — commencement notices
Dublin 22, Dublin
3 unique commencement events · latest notified commencement 21 Sep 2022 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 21 Sep 2022
- Latest notice
- 63 m²
- Planning references supplied
- SD18A/0323
- Public location
- Dublin 22, Dublin
Major-project dossier · Wave 2 · W2-071 · Batch 4
Reviewed planning, commencement and document evidence
Exact project story for SD18A/0323 under South Dublin County Council, retaining 3 separate commencement identities.
Source-backed scopeGrangecastle Business Park — commencement notices
Planning permission scale, commencement-event scale and official document titles remain separate; no notice totals are summed.
- Commencement identities
- 3 retained separately
- Latest group date
- 2022-09-21 not assigned across events
- Maximum on one notice
- Not stated never summed
- Reviewed index
- 0 0 exact document links
- Permitted scale
- 7380 m² permission record; not summed with notices
Planning and appeal references
- Planning_Application SD18A/0323 Open exact official record
Supplier screening cues
- Residential or built-area scale screening cuePermitted scale record states 7,380 m² floor area.
Every retained commencement event
- 2022-03-28 CN0087630SD 7246 m² on this event Open official commencement source
- 2022-06-07 CN0090132SD 7246 m² on this event Open official commencement source
- 2022-09-21 CN0093712SD 63 m² on this event Open official commencement source
Exact organisation roles
- South Dublin County CouncilPlanningauthority · Exact official planning record SD18A/0323.
Explicit facts with official citations
Each statement keeps its exact reference, official title or drawing-title locator, and review state.
- Planningoutcome Planning outcome recorded as GRANT PERMISSION. SD18A/0323 · Official planning record — SD18A/0323 · Decision field · exactauthorityreferencerecord Open official evidence
- Permittedscale Permitted scale record states 7,380 m² floor area. SD18A/0323 · Official planning record — SD18A/0323 · Residential units and floor-area fields · exactauthorityreferencerecord Open official evidence
Source limitations and event boundary
Event identities aligned. The reviewed dossier snapshot and the current public group contain the same commencement references.
- No drawing, report or decision title was available through the approved collector for this exact authority/reference pair.
- Organisation roles are limited to the exact planning authority and, where present, the appeal authority; no project-team or supplier role is inferred.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 22, Dublin
- County
- Dublin
Notice location variants
- Grangecastle Business Park, Clondalkin, Co CN0093712SD
- roof level, that includes a reception area (274 CN0090132SD, CN0087630SD
- Notice source points are up to 612 m apart, so no combined representative point is shown.
Source positions remain separate:
- CN0093712SD · 53.328059, -6.434138 Open point
- CN0090132SD · 53.328059, -6.434138 Open point
- CN0087630SD · 53.329648, -6.442956 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD18A/0323. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed ESB Substation on the site of a Data Centre (Interxion IX DUB4) at Grangecastle Business Park, Clondalkin, Co. Dublin. The ESB Sub station is a single storey typical ESB Substation divided into two areas, An ESB room and a customer switch room. The proposed ESB substation will be adjacent to, and connected to the existing ESB Substation.
Floor area stated for this source: 63 m².
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at roof level, that includes a reception area (274.4sq.m), shipping area (264.3sq.m) and three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at ground floor; storage (476sq.m) at mezzanine level above the shipping area; and office (560sq.m), three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at first floor level; and service spine at second floor level only. The new data centre will include plant at roof level; associated support services, 7 standby generators with associated flues (each 17.29m high). These generator units provide back up power to the data halls. An external steel gantry and access stairs is provided to the external generators for inspection and maintenance of the upper level. The proposed facility is to be located within the Grange Castle Business Park and access to the site will be from the existing roads within the business park. Refer to site plan for further details. The proposed building (to be called IX Dub04) is very similar to that previously approved for the IX DUB03 data centre building, also applied for by the same applicant, Interxion Ireland and the new data centre shall be on the same site as IX DUB03, and under the same ownership.
Floor area stated for this source: 7,246 m².
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at roof level, that includes a reception area (274.4sq.m), shipping area (264.3sq.m) and three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at ground floor; storage (476sq.m) at mezzanine level above the shipping area; and office (560sq.m), three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at first floor level; and service spine at second floor level only. The new data centre will include plant at roof level; associated support services, 7 standby generators with associated flues (each 17.29m high). These generator units provide back up power to the data halls. An external steel gantry and access stairs is provided to the external generators for inspection and maintenance of the upper level. The proposed facility is to be located within the Grange Castle Business Park and access to the site will be from the existing roads within the business park. Refer to site plan for further details. The proposed building (to be called IX Dub04) is very similar to that previously approved for the IX DUB03 data centre building, also applied for by the same applicant, Interxion Ireland and the new data centre shall be on the same site as IX DUB03, and under the same ownership.
Floor area stated for this source: 7,246 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.