Site start

Housing site start — Thurles

Thurles, Tipperary

2 commencement notices · latest start date 18 Dec 2019 · planning reference given

Planning 19600836 · Planning application · Council file · external

View full project timeline

Commencement notices
2
Latest start date
18 Dec 2019
Latest notice
1 house
Planning reference
19600836
Location
Thurles, Tipperary

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Thurles, Tipperary
County
Tipperary
Location evidence needs care
  • Notice source points are up to 560 m apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 52.650740, -7.701145 Open point
  • Public notice source · 52.654427, -7.706793 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Tipperary County Council planning record Application details, status and decision record for 19600836. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

alterations to previously approved planning register reference 18/600151, the proposed alterations relate to the relocation of and minor alterations to previously approved single storey detached dwelling, site entrance wastewater treatment system and percolation area and all associated site works.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 191 m².

Planning reference 19600836
Notice 2 Commencement notice (owner-supplied)

Minor alterations to previously approved (18600151) single storey detached dwelling, site entrance, wastewater treatment system and percolation area and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 191 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 19600836

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.