Commencement notice group

Housing commencement notices — Nenagh

Nenagh, Tipperary

1 unique commencement event · latest notified commencement 01 Oct 2025 · planning basis not stated

Unique commencement events
1
Latest notified commencement
01 Oct 2025
Latest notice
1 unit
Planning references supplied
None stated
Public location
Nenagh, Tipperary

Planning-anchored public geography

Site identity and location

Canonical public locality
Nenagh, Tipperary
County
Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Tipperary County Council planning record Application details, status and decision record for 2424. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0134317TT BCMS open-data feed

i) Change of use from offices to residential ii) Reconfiguration of internal rooms of both floors of the protected structure, iii) The replacing of the non original aluminimum windows with traditional timber sash windows, iv) the alteration and addition of window opes to the rear portion of the building v) Replace flat roof to the rear portion of the building vi) The removal of an existing 1970's toilet block within the courtyard of the existing building vii) Reinstatement of garden boundary wall and all associated site works to facilitate the works on and under the land.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 185 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.