Site start
Site start — Golden
Golden, Tipperary
2 commencement notices · latest start date 12 May 2020 · planning reference given
Planning 17/601216 · Planning application · Council file · external
- Commencement notices
- 2
- Latest start date
- 12 May 2020
- Latest notice
- 2,448 m²
- Planning reference
- 17/601216
- Location
- Golden, Tipperary
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 17/601216 Tipperary County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Golden, Tipperary
- County
- Tipperary
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Tipperary County Council planning record Application details, status and decision record for 17/601216. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 6no. Mushroom tunnels, Building Canopy and dry goods store no 61
Floor area stated for this source: 2,448 m².
Development of 6no. Mushroom tunnels with Building Canopy, decommission existing sceptic tank and percolation area and replace with new wastewater treatment system and percolation area to a new area on the site, proposed two soil water tanks and 40 space carpark.
Floor area stated for this source: 2,768 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.