Site start
Building extension site start — Dun Laoghaire
Dun Laoghaire, Dublin
1 commencement notice · start date 07 Apr 2015 · planning reference given
Planning D14A/0713 · Planning application
- Commencement notices
- 1
- Latest start date
- 07 Apr 2015
- Latest notice
- 1 house
- Planning reference
- D14A/0713
- Location
- Dun Laoghaire, Dublin
Location
Where the site is
- Area
- Dun Laoghaire, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Opening up works to front ground floor bedroom Erection of timber stud wall to create an en-suite bathroom at ground floor level Removing one number door and closing in same with timber stud partition Replace with new - sanitary ware to existing bathroom Removing one number wall at ground floor level to allow for open kitchen living space Increase ope size of one number window to rear elevation at ground floor level to proposed living space Replace existing double doors to rear with double glazed - detail to match Installation of solid fuel burning stove to living space Remedial repair works to existing double glazed windows throughout dwelling Replacement of all roof lights with same Remedial repair work to externals of building, including roof and walls Creation of bedroom at first floor level with associated fire rated timber frame wall construction Internal breathable insulation throughout dwelling Re-wire, re-plumb and insulate roof space as required. All associated site works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.