Commencement notice group

Housing commencement notices — Ballinasloe

Ballinasloe, Galway

1 unique commencement event · latest notified commencement 17 Aug 2023 · planning basis not stated

Unique commencement events
1
Latest notified commencement
17 Aug 2023
Latest notice
291 m²
Planning references supplied
None stated
Public location
Ballinasloe, Galway

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Ballinasloe, Galway
County
Galway
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

SN0008968GC BCMS open-data feed

This application relates to 7 Day Fire Safety Application for the change of Use from an Existing Residential to Refugee Accommodation. Exempted development as per Circular S.I. No. 306 of 2022 – Circular Letter: EUIPR 3/2022 – European Union (Planning and Development) (Displaced Persons from Ukraine Temporary Protection) Regulations 2022 issued on 01 July 2022 The development consists of a Change of Use of the Existing Residential to Refugee Accommodation as indicated on the drawings. This application relates to an existing 2-storey Residential unit converting into a Refugee Accommodation, wherein the building will be comprising of 12no. Bedrooms, 3no. Bathrooms, WC, Sitting Room, Dining Room, Utility, Kitchen and Conservatory having a direct access on 11no. bedroomsthrough a common protected hall via entrance on the ground floor. There is a Boiler Room that can access at the rear area and a proposed external fire escape stairs for the first floor located at the rear area of the unit.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 291 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.