Commencement notice group

Commencement notices — Galway

Galway, Galway

1 separate notice · latest notified commencement 15 Apr 2026 · planning reference supplied

Source notices
1
Latest notified commencement
15 Apr 2026
Latest notice
16,261 m²
Planning references supplied
ABP-318194-23
Public location
Galway, Galway

Public source geography

Site location

Public site / locality
Galway, Galway
County
Galway
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Appeal referenceABP-318194-23

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0014061GY BCMS open-data feed

Commencement of Phase 1 of a proposed healthcare development at Seamus Quirke Road, Galway, in accordance with the Fire Safety Certificate application submitted by way of 7-Day Notice, comprising the construction of: • an 8-storey Primary Care Centre, and • a partial underground basement car park, including all associated structures, services, access and ancillary works necessary to serve Phase 1 only. The overall development, as set out in the Fire Safety Certificate application, also includes a 4-storey office building (Tusla) constructed over a shared basement, which forms Phase 2 of the development. Phase 2 works are expressly excluded from this Commencement Notice and will be the subject of a separate Commencement Notice prior to commencement.

16,261 m² · stated on this notice

Appeal reference ABP-318194-23

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.