Commencement notice group
Commencement notices — Galway
Galway, Galway
1 unique commencement event · latest notified commencement 15 Apr 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 15 Apr 2026
- Latest notice
- 16,261 m²
- Planning references supplied
- ABP-318194-23
- Public location
- Galway, Galway
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Major-project dossier · Wave 1 · G13
Reviewed planning, commencement and document evidence
Source-backed scopeCommencement notices — Galway
Planning scope and commencement-event scale are retained as separate evidence; this label is not expanded into unreviewed works.
- Commencement identities
- 1 retained separately
- Latest group date
- 15 Apr 2026 not assigned across events
- Maximum on one notice
- 0 units never summed
- Reviewed index
- 0 0 exact document links
Planning and appeal references
- Appeal ABP-318194-23 Exact dated record link unavailable in this reviewed source
Supplier screening cues
- Built-area screening cueMaximum stated floor area on one retained notice: 16261 m².
Every retained commencement event
- 15 Apr 2026 SN0014061GY 16261 m² on this event Official public source URL unavailable in the reviewed projection
Exact organisation roles
- Galway City CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
- An Coimisiún PleanálaAppealauthority · One or more appeal references are retained.
Source limitations and event boundary
Event identities aligned. The reviewed dossier snapshot and the current public group contain the same commencement references.
- The public evidence source provides a project label, references, group-level maxima and a reviewed document extract; it does not provide a full permission description for this dossier.
- Planning and appeal event dates are unavailable in the reviewed public source and are not inferred.
- Organisation coverage is limited to the responsible planning authority and, where an appeal reference exists, An Coimisiún Pleanála; no supplier appointment is claimed.
- Reviewed public index extract; this is not asserted to be the complete authority file.
- No publishable exact official planning-record URL was available in the reviewed source.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Galway, Galway
- County
- Galway
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-318194-23. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Commencement of Phase 1 of a proposed healthcare development at Seamus Quirke Road, Galway, in accordance with the Fire Safety Certificate application submitted by way of 7-Day Notice, comprising the construction of: • an 8-storey Primary Care Centre, and • a partial underground basement car park, including all associated structures, services, access and ancillary works necessary to serve Phase 1 only. The overall development, as set out in the Fire Safety Certificate application, also includes a 4-storey office building (Tusla) constructed over a shared basement, which forms Phase 2 of the development. Phase 2 works are expressly excluded from this Commencement Notice and will be the subject of a separate Commencement Notice prior to commencement.
Floor area stated for this source: 16,261 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.