Site start
Building extension site start — Ballsbridge
Ballsbridge, Dublin
1 commencement notice · start date 09 Mar 2020 · planning reference given
Planning 3951/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 09 Mar 2020
- Latest notice
- 1 unit
- Planning reference
- 3951/19
- Location
- Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
Addresses on the notices
- lower ground and upper ground floor levels
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposed development will consist of the demolition of existing 42m2 single storey side extension and garden wall; construction of a new two-storey 55m2 side [North-West] extension and adjoining new three-storey 137m2 extension to side [North] and rere [East]; installation of new lift; removal of modern glazing to existing side and rere elevations at lower ground and upper ground floor levels; reconfiguration of rooms to create accessible bedroom and bathroom at lower ground floor level; new opening between two existing rooms at lower ground floor level; reconfiguration of upper ground floor bathroom; re-opening existing blocked opening in rere elevation at upper ground floor level; reconfiguration of existing main bathroom and en-suite bathrooms at first floor level; new opening in side elevation at first floor level to provide for proposed window to existing en-suite; new pitched roof structure to replace existing flat roof over previously permitted development at first floor level, incorporating 3no. new rooflights; upgrading of mechanical and electrical services; removal of existing external boiler-house and timber outbuildings to side and construction of new boilerhouse to rere; landscaping works to front and rere; and ancillary site works.
Floor area stated for this source: 579 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.