Commencement notice group
Housing commencement notices — Blackrock
Blackrock, Dublin
1 unique commencement event · latest notified commencement 27 Jan 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 27 Jan 2026
- Latest notice
- 1 house
- Planning references supplied
- D25A/0577/WEB
- Public location
- Blackrock, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Blackrock, Dublin
- County
- Dublin
Notice location variants
- entrance level, create opening of single door from rear return to facilitate connection to garden CN0137653DR
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the change of use from multi occupancy dwelling to single family dwelling and construction work to include: a) Reinstatement of stairs between ground and lower ground floor levels; b) overhauling original timber windows and replacing non original windows with traditional sash windows; c) Repointing of brickwork to front elevation, repair of natural slate roof, soffits and eaves, replacement of rain water gutters and downpipes, localised repair to chimneys, damp proofing to basement; d) Create opening between main reception rooms at entrance level, create opening of single door from rear return to facilitate connection to garden; e) Create lower ground floor rear extension of 18m2; f) New side entrance at ground floor level and external store of 12m2; g) Removal of non-original partitions, fittings and fixtures & demolition of existing extension (12m2) & out buildings (102m2); h) Renewal of mechanical and electrical services and decoration; i) Including all necessary site works.
Floor area stated for this source: 474 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.