Site start
Commercial site start — Dublin
Dublin
1 commencement notice · start date 18 Dec 2020 · planning reference given
Planning 2275/20 · Planning application
- Commencement notices
- 1
- Latest start date
- 18 Dec 2020
- Latest notice
- 680 m²
- Planning reference
- 2275/20
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- 2nd and 3rd floor level, extending the rear stairwell from 1st to 3rd floor level with a new AOV provided
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Reconfiguration and part extension within an existing 5 storey office development over a basement car park. The works comprise part extensions at 2nd and 3rd floor level, extending the rear stairwell from 1st to 3rd floor level with a new AOV provided. There will be a CAT A fit-out to the part extensions including raised access floors and suspended ceilings with cavity barriers, lighting, ventilation, VRF system and life safety systems. The works to the existing structure comprises new universal access WC to all upper floors, enlarging of window opening and new fire rated glazing at lower ground floor level (North Elevation), replacement of glazing from lower ground to 3rd Floor level (South Elevation), replacement of glazing at lower ground floor level (East Elevation) and a new platform lift extending from lower to upper ground floor level along the front elevation. At basement level the works comprise new toilet block, locker room, drying room, lobby area, bin store, tank room and telecom Room.
Floor area stated for this source: 680 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.