Site start
Building extension site start — Terenure
Terenure, Dublin
1 commencement notice · start date 02 Feb 2026 · planning reference given
Planning 3418/24 · Planning application
- Commencement notices
- 1
- Latest start date
- 02 Feb 2026
- Latest notice
- 115 m²
- Planning reference
- 3418/24
- Location
- Terenure, Dublin
Location
Where the site is
- Area
- Terenure, Dublin
- County
- Dublin
Addresses on the notices
- ground level of 1no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The Development consists of: 1) The demolition of the existing structurally unsound two storey return and annexe to the rere elevation (south); 2) The construction of a new, two-storey extension to the rere elevation (south) of the existing building with flat green roof and parapet: The west elevation to the proposed extension is reduced to a single storey where it addresses the shared boundary wall between number 77 & 76 Brighton Square; 3) The provision at ground level of 1no. window to existing and 1no window to proposed east facing gable elevation and the provision at first floor level of 1no. window to proposed extension; 4) The provision of 2no flat rooflights to roof of single storey portion of extension and the provision on 1no flat rooflight to two storey portion of extension; 5) All associated external drainage and site works.
Floor area stated for this source: 115 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.