Site start
Building extension site start — Clarecastle
Clarecastle, Clare
1 commencement notice · start date 27 Jun 2016 · planning reference given
Planning P15-888
- Commencement notices
- 1
- Latest start date
- 27 Jun 2016
- Latest notice
- Scale not stated
- Planning reference
- P15-888
- Location
- Clarecastle, Clare
Location
Where the site is
- Area
- Clarecastle, Clare
- County
- Clare
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1) modifications and extension to the 04 building consisting of (a) demolish existing storage room. (b) construct new parts cleaning room (c) remove existing door and steel platform, install new door, new platform and stairs, (d) demolish existing ladder and install new ladder and window to 04 building, (2) modifications to 09 building consisting of extension to existing switch room and (3) modifications to R&A building consisting of (a) modify and raise roof and part of western elevation (b) install new door to eastern elevation (c) carry out internal alterations including changes to existing layout of laboratories and office accommodation areas and (d) carry out all associated ancillary works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.