Site start
Site start — New Birmingham
New Birmingham, Tipperary
1 commencement notice · start date 25 Jun 2018 · planning reference given
Planning 16600200 · Council file · external
- Commencement notices
- 1
- Latest start date
- 25 Jun 2018
- Latest notice
- 55 m²
- Planning reference
- 16600200
- Location
- New Birmingham, Tipperary
Location
Where the site is
- Area
- New Birmingham, Tipperary
- County
- Tipperary
Addresses on the notices
- each end, new bay in existing 38 kV busbar, existing chainlink compound fence to be replaced with new 2
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alteration to the existing 38 kV station consisting of demolition of existing control building and replacement with a new single storey control building, new 38 kV bunded transformer, existing MV busbar to be extended at each end, new bay in existing 38 kV busbar, existing chainlink compound fence to be replaced with new 2.65 m high palisade fence and new gates, associated drainage and site works.
Floor area stated for this source: 55 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.