Site start
Building extension site start — Rush
Rush, Dublin
1 commencement notice · start date 27 Mar 2015 · planning reference given
Planning F13A/0253 · Planning application
- Commencement notices
- 1
- Latest start date
- 27 Mar 2015
- Latest notice
- Scale not stated
- Planning reference
- F13A/0253
- Location
- Rush, Dublin
Location
Where the site is
- Area
- Rush, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
WORKS TO BE INCLUDED WITHIN PHASE ONE: Notices lodged 18/02/2014 Permission for works to Protected Structure and within the curtilage of Protected Structures Lambay Island, Rush, Co. Dublin. Lambay Island or parts thereof form part of, or are adjacent to, a Natura 2000 site, a Special Area of Conservation, a Special Protection Area, a proposed Marine Special Area of Conservation and a proposed Natural Heritage Area. PHASE ONE of The development will consist of: 1. Alterations to the Castle, a National Monument, and to the linked Guest Wing including installation of upgraded central heating, plumbing and electrical systems; in the Castle, conversion of a sluice room to a shower room, construction of a new underground toilet extension (net addition 2.6m2); minor modifications to fixtures and fittings in two bedrooms and in a toilet; in the Guest Wing, conversion of two bedrooms to bathrooms, works to fixtures and fittings in the kitchen, and scullery. Installation of limited plant equipment within existing barn and livestock accommodation within the Farmyard complex to accommodate an energy centre / plant room. 9. Works to the services and utilities infrastructure on the island comprising within this phase construction of photovoltaic panel arrays in the ilex field immediately to the east of the proposed farmyard energy / plant centre. Installation of limited underground heating and service connections linking the proposed energy centre with the Castle / Guest Wing. All the above works arising on foot of works permitted
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.