Site start

Commercial site start — Cahir

Cahir, Tipperary

1 commencement notice · start date 27 Oct 2025 · planning reference given

Planning PT8TT27 · Planning application

Commencement notices
1
Latest start date
27 Oct 2025
Latest notice
154 m²
Planning reference
PT8TT27
Location
Church Street, Cahir, Tipperary

Location

Where the site is

Area
Cahir, Tipperary
County
Tipperary

Addresses on the notices

  • Church Street, Cahir, Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Change of use of 2nd floor of existing building from office to a library. Alterations to the internal layout including new stairs and the upgrade of building services and energy saving retrofit works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 154 m².

Planning reference PT8TT27 Developer stated: Tipperary Co Co

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.