Commencement notice group

Commercial commencement notices — Leopardstown

Leopardstown, Dublin

2 unique commencement events · latest notified commencement 04 Aug 2015 · planning references supplied

View full project timeline

Unique commencement events
2
Latest notified commencement
04 Aug 2015
Latest notice
1 unit
Planning references supplied
D14A/0351 · P/1526
Public location
Leopardstown, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Leopardstown, Dublin
County
Dublin

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

A new office development (Microsoft Ireland Dublin Campus), comprising a 4-5 storey building over 2 levels of basement (undercroft). Maximum building height (including roof plant) of +c.117.085m O.D. Office accommodation provided on all floors and with ancillary staff facilities (WC's canteen facilities, storage etc). Basement levels to include: 215no. car parking spaces, 24no. motorcycle spaces and 220no. bicycle parking spaces, staff gym/leisure centre with changing/shower/toilet areas, ESB sub-station, services and plant areas, waste management areas, security areas, deliveries and storage areas. Roof level to include additional plant/services and green roof. Surface car parking for 343no. spaces, drop off area with short-stay parking, circulation routes, landscaped open spaces. All associated site development, boundary treatment and landscaping works. Total gross floor area of the proposed development is c.34,554 sqm over basement area of c.13,738 sqm.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference D14A/0351 Planning reference P/1526
Notice 2 Commencement notice (owner-supplied)

Site enabling works relating to the Microsoft Ireland Dublin Campus, comprising setup of site hoarding, termination of existing live services, realignment of existing roads, bulk excavations to formation levels, two retaining wall structures, blinding formation of Level -2 and trench excavations for drainage works beneath Level -2.

Work stated for this notice Scale not stated for this notice.

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Planning reference D14A/0351 Planning reference P/1526 Builder stated: Wills Bros. Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.