Commencement notice group

Commencement notices — Dublin

Dublin 2, Dublin

1 unique commencement event · latest notified commencement 06 May 2021 · planning basis not stated

Unique commencement events
1
Latest notified commencement
06 May 2021
Latest notice
5,743 m²
Planning references supplied
None stated
Public location
Dublin 2, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin 2, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0075459DC BCMS open-data feed

70 St Stephen’s Green, Dublin 2 - This Commencement Notice is for the deferred scope of work which was not completed by the Landlord Team under the Completion Certificate with reference No: CCDC and will now be undertaken by the Tenant Team under this commencement notice. The deferred works refer to works within the tenant areas on ground and upper floors and ground floor reception as follows; 1. Raised Access Floor and associated Finishes 2. Suspended Ceiling 3. LPHW & CW Services Installation 4. Ventilation & Air Conditioning Installation 5. Above Ground Soils and Wastes connections outside the cores, including condensate drainage 6. Fire Services, including dampers (NB excludes dampers installed along fire compartment lines by landlord) 7. General Electrical Services and wiring installation 8. Mechanical power cabling 9. General and additional emergency lighting installation 10. Additional fire alarm installation 11. Reception Area - All finishes including the Reception Desk in the entrance hall.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 5,743 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.