Site start
Post Primary school — site start
Balbriggan, Dublin
1 commencement notice · start date 14 Dec 2015 · planning reference given
Planning F15A/0242 · Planning application
- Commencement notices
- 1
- Latest start date
- 14 Dec 2015
- Latest notice
- Scale not stated
- Planning reference
- F15A/0242
- Location
- Clonard Rd, Balbriggan, Dublin
Location
Where the site is
- Area
- Balbriggan, Dublin
- County
- Dublin
Addresses on the notices
- Clonard Rd, Balbriggan, Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Permission for the construction of a new School building. The building comprises two construction phases. Phase one comprising of 1 No. 2 Storey 450 pupil Post Primary school building with physical education hall, special needs unit; support teaching spaces and ancillary accommodation, with a total floor area of 7510 sq.m. Phase two comprises of 1 no.2 storey extension of the school to accommodate 300 additional pupils, comprising teaching spaces and ancillary accommodation, with a floor area of C. 1890 sq.m. The total floor area for both phases is C. 9400 sq.m. The site works to the school grounds will consist of the provision of 140 no. cycle storage space, bin stores, ball courts, secure play area, 50m sq. external storage building, covered work area, landscaping, ESB Substation and boundary treatment and all other associated site development works. The works to the remainder of the site consists of the provision of 46 No. car parking spaces, drop-off and pick-up facilities and new access road in Phase one. Phase two comprises 14 No. additional car parking spaces. There will be a total of 60 No. car parking spaces for both phases. All on a site C.5.538 Hectares located to the Northwest of the existing St George's National School off the Clonard Road (R122), Balbriggan. Roll No. 15315J
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.