Commencement notice group
Housing commencement notices — Dublin
Dublin 4, Dublin
1 unique commencement event · latest notified commencement 06 Apr 2026 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 06 Apr 2026
- Latest notice
- 456 m²
- Planning references supplied
- None stated
- Public location
- Dublin 4, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 4, Dublin
- County
- Dublin
Notice location variants
- upper ground floor level on the North-west facade, replacement of uPVC windows to the rear wit CN0139871DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
PROTECTED STRUCTURE & CHANGE OF USE: Works will consist of: change of use of the building from office use to a single residential house (as previously granted under Reg. Ref: 4007/24). Construction of a part single storey, part two storey extension to the side and rear, including a double height space. Internal alterations to the existing building including: closing up of interconnecting doors with 27 Clyde Road, removal of stud partition walls on all floors, relocation of some door openings, the replacement of the stairs from lower ground floor to upper ground floor, laying a new concrete floor slab to the lower ground floor with insulation and underfloor heating. Form two new window openings at upper ground floor level on the North-west facade, replacement of uPVC windows to the rear with new up-and-down timber sash windows, refurbishment of existing sash windows to the front and side of the house, replacement of front door with new door to original detail, the alteration of three windows to form door openings and repointing of the brickwork to the front facade. New mechanical and electrical installation including new electrical and gas meters to the front of the house in accordance with Bord Gais and ESB standards. New bathrooms fit outs. New surface water drainage. Landscaping works including gravel parking area to the front and paved terrace to the rear. Widening of the existing vehicular entrance.
Floor area stated for this source: 456 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.