Protected structure · Co. Dublin

26 Clyde Road, Dublin 4

Granted 16 Sep 2025 (final grant issued 22 Oct 2025)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application WEB2229/25 at 26 Clyde Road, Dublin 4: Works will consist of change of use of the building from office use…
  • It was received by Dublin City Council on 30 May 2025.
  • Status: Granted 16 Sep 2025 (final grant issued 22 Oct 2025).
  • Work was due to start on 6 Apr 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Dublin City Council planning register, checked 2 Jun 2026. Search the council's register

More planning applications in Dublin 4 · Planning applications in Co. Dublin

What and where

Works will consist of change of use of the building from office use…

PROTECTED STRUCTURE & CHANGE OF USE: Works will consist of: change of use of the building from office use to a single residential house (as previously granted under Reg. Ref: 4007/24). Construction of a part single storey, part two storey extension to the side and rear, including a double height space. Internal alterations to the existing building including: closing up of interconnecting doors with 27 Clyde Road, removal of stud partition walls on all floors, relocation of some door openings, the replacement of the stairs from lower ground floor to upper ground floor, laying a new concrete floor slab to the lower ground floor with insulation and underfloor heating. Form two new window openings at upper ground floor level on the North-west facade, replacement of uPVC windows to the rear with new up-and-down timber sash windows, refurbishment of existing sash windows to the front and side of the house, replacement of front door with new door to original detail, the alteration of three windows to form door openings and repointing of the brickwork to the front facade. New mechanical and electrical installation including new electrical and gas meters to the front of the house in accordance with Bord Gais and ESB standards. New bathrooms fit outs. New surface water drainage. Landscaping works including gravel parking area to the front and paved terrace to the rear. Widening of the existing vehicular entrance.

Location
Dublin 4, Co. Dublin Map
Planning reference
WEB2229/25

Numbers and dates

Project type
Protected structure
Received
30 May 2025
Decision to grant
16 Sep 2025
Final grant
22 Oct 2025
Site start notified
6 Apr 2026
Protected structure
Yes

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Site history

This site's history

  1. Earlier permission 4007/24 for this site: granted 4 Sep 2024.

    PROTECTED STRUCTURE : Permission for development at this site no.26 Clyde Road, Ballsbridge, Dublin 4 which is a protected structure. The… Named in this application's description
  2. Application WEB2229/25Sub02 at the same address: received 29 Oct 2026, no decision recorded yet.

    10. The Developer shall comply with the following requirements of the Conservation Officer: c) In the course of works taking place on site… Same address

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Work was due to start on 6 Apr 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference WEB2229/25.Search the register

How we know this

From the Dublin City Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Site starts

Commencement notices for this permission

  1. 6 Apr 2026Notice filed · PROTECTED STRUCTURE & CHANGE OF USE: Works will consist of: change of use of the...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 4

Get alerts for Dublin 4Free. We email you when new applications appear.

Free email alerts

Get new Dublin 4 projects by email

New applications, decisions and site starts in Dublin 4, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options