Commencement notice group
Housing commencement notices — Donaghmede
Dublin 13, Dublin
8 unique commencement events · latest notified commencement 10 Jul 2024 · planning references supplied
- Unique commencement events
- 8
- Latest notified commencement
- 10 Jul 2024
- Latest notice
- 70 m²
- Planning references supplied
- 31200321 · ABP-312003-21
- Public location
- Dublin 13, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 13, Dublin
- County
- Dublin
Notice location variants
- Dublin, Dublin CN0116983DC, SN0010309DC, SN0007635DC, SN0007431DC
- Donaghmede, Dublin SN0008718DC
- Notice source points are up to 394 m apart, so no combined representative point is shown.
Source positions remain separate:
- CN0116983DC · 53.404347, -6.170405 Open point
- CN0116851DC · 53.404347, -6.170405 Open point
- SN0010309DC · 53.403897, -6.168331 Open point
- SN0008718DC · 53.404347, -6.170405 Open point
- SN0007635DC · 53.404953, -6.164554 Open point
- SN0007623DC · 53.406148, -6.168521 Open point
- SN0007565DC · 53.403380, -6.166554 Open point
- SN0007431DC · 53.403535, -6.169187 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-312003-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The building to which this application refers to is for an external standalone ESB Substation, Switch Room and Bin Store which is ancillary to Block 3 on the Parkside 5B development. The building is a single storey structure. The building is split into three rooms.
Floor area stated for this source: 70 m².
[This application is lodged for] The construction of a new residential building (Block 3, Parkside 5B, Dublin 13), forming a single building block on a more larger overall site. Block 3 consists of two residential cores over a shared ground slab. Each core will have a single stair arrangement. One of the residential cores will provide two-six storeys with the second consisting of six storeys. A total of 91 units will be provided for this block spread over the two cores.
Floor area stated for this source: 10,090 m².
Source unit value with scope not stated: 743 units. It is not presented as notice-specific scale.
First time fit-out of a creche on the ground floor (shell & core) of Block 4, Parkside 5b
Floor area stated for this source: 530 m².
The construction of a new residential building (Block 2, Parkside 5b, Dublin 13), forming a single block on a larger overall site. The building shall consist of three residential cores, referred as 1, 2, and 3, each core is served by a single escape stair connected by a basement car park. Block 2 will provide 173 units consisting of one, two and three bedroom apartments. Amenity spaces will be provided on ground and first floor in Core 3. The basement is single storey and is situated below all cores, the basement will allow for residential car parking, bike storage, bin stores and housing for plant.
Floor area stated for this source: 25,313 m².
The construction of a new residential building (Duplex Block A, Parkside 5b, Dublin 13), forming a single block on a larger overall site. The building shall consist of 8 No. single storey units with own door access beneath 8 No. duplexes accessed via external stepped access routes.
Floor area stated for this source: 1,623 m².
The construction of a new residential building (Duplex Block B, Parkside 5b, Dublin 13), forming a single block on a larger overall site. The building shall consist of 8 No. single storey units with own door access beneath 8 No. duplexes accessed via external stepped access routes.
Floor area stated for this source: 1,623 m².
The construction of a new residential building (Block 4, Parkside 5b, Dublin 13), forming a single block on a larger overall site. The building shall consist of two uses. Ground floor consists of a creche, and residential area which will form the remainder of the accommodation throughout all levels of the building. The residential area will provide 35 units consisting of one-, two-, and three-bedroom apartments. Amenity spaces for residential use will be provided on ground floor. The creche will consist of 6 no. classrooms along with ancillary accommodation typical for a creche.
Floor area stated for this source: 3,979 m².
[This application is lodged for] The construction of a new residential building (Block 5, Parkside 5b, Dublin 13), forming a single block on a larger overall site. Block 5 will consist of three cores, each of which will be a single stair building serving residential apartments on each level, connected by a basement level below consisting of car parking and ancillary areas. Two of the cores will provide five stories above ground level, with the third core providing six stories above ground level. All three stair cores will continue into the basement level, the basement will provide parking and storage facilities and connects all the above cores. A total of 203 apartments will be provided, additionally five two-storey maisonnettes/duplexes which are independently accessed will be provided on ground and first floor. An amenities space is also provided on the ground floor, this will provide flexible work spaces, a bar, kitchen and dining area, a gym and studio for free use.
Floor area stated for this source: 13,282 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.