Site start

Commercial site start — Bothar na Mine

Bothar na Mine, Galway

2 commencement notices · latest start date 04 Aug 2020 · planning reference given

Planning 18/10 · Council file · external

View full project timeline

Commencement notices
2
Latest start date
04 Aug 2020
Latest notice
1,264 m²
Planning reference
18/10
Location
Bothar na Mine, Galway

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Bothar na Mine, Galway
County
Galway

Addresses on the notices

  • ESB Galway 110 kV Substation, Ballybane Industrial Estate, Bothar na Mine, Galway
  • Galway
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Galway City Council planning record Application details, status and decision record for 18/10. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of a new building: 2 storey 110kV Gas Insulated Switchgear (GIS) building and associated site works at : ESB Galway 110 kV Substation, Ballybane Industrial Estate, Bothar na Mine, Galway.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,264 m².

Planning reference 18/10
Notice 2 Commencement notice (owner-supplied)

Proposed development at this stage of the works includes the construction of the internal palisade fence, new palisade gate to the public roadway, new temporary construction stone road, diversion of existing MV cables, demolition of existing equipment plinths and building and site investigation works for the design of the GIS building only. Note only building works is the demolition of the existing MV building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 16 m².

Planning reference 18/10

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.