Commencement notice group

Commercial commencement notices — Bothar na Mine

Bothar na Mine, Galway

2 unique commencement events · latest notified commencement 04 Aug 2020 · planning basis not stated

View full project timeline

Unique commencement events
2
Latest notified commencement
04 Aug 2020
Latest notice
1,264 m²
Planning references supplied
None stated
Public location
Bothar na Mine, Galway

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Bothar na Mine, Galway
County
Galway

Notice location variants

  • ESB Galway 110 kV Substation, Ballybane Industrial Estate, Bothar na Mine, Galway
  • Galway, Galway
Location evidence needs care
  • Notice source points are up to 89.5 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 53.142367, -7.692054 Open point
  • Public notice source · 53.289516, -9.014119 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Galway City Council planning record Application details, status and decision record for 18/10. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of a new building: 2 storey 110kV Gas Insulated Switchgear (GIS) building and associated site works at : ESB Galway 110 kV Substation, Ballybane Industrial Estate, Bothar na Mine, Galway.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,264 m².

Builder stated: Kilcawley Construction
Notice 2 Commencement notice (owner-supplied)

Proposed development at this stage of the works includes the construction of the internal palisade fence, new palisade gate to the public roadway, new temporary construction stone road, diversion of existing MV cables, demolition of existing equipment plinths and building and site investigation works for the design of the GIS building only. Note only building works is the demolition of the existing MV building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 16 m².

Builder stated: T.connolly & SON LTD

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.