Site start

Housing site start — Dublin

Dublin

1 commencement notice · start date 30 Jan 2023 · planning reference given

Planning 3739/21 · Planning application

View full project timeline

Commencement notices
1
Latest start date
30 Jan 2023
Latest notice
290 m²
Planning reference
3739/21
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development will consist of: The remodel and extension of an existing three-storey terraced house with two-storey rear return. The works include for the provision of a 50M2 two-storey extension to the rear. Works to the existing house include; Garden Level: Removal of section of rear wall, modifications to layout of hallway, removal of building fabric to form new opening between front and rear primary rooms, modifications to rear return door ope to garden. Upper Ground Floor Level: modification of existing opening at rear wall of main house to the rear return, removal of building fabric to form a new ope to rear wall of rear return, removal of non-original partitions in primary rooms, removal of non-original bathroom at rear return. First Floor Level: removal of existing partition walls, the provision of 2 no. en suite bathrooms. Attic Level: removal of non-original window to attic half landing (rear) to facilitate reinstatement of original string course, new partitions to attic to provide office space and storage, 2 no. roof lights at attic level to be enlarged and the addition of 1 no. new rooflight (rear) External: Brick facade repointing (front), refurbishment of existing windows, reinstatement of cast iron railings, New vehicular access and parking space to rear. Fabric of the existing building: Due to the building suffering fire damage, subsequently not being watertight, and the building being unoccupied for many years there is significant dry and wet rot. Throughout all floors it will be necessary to replace any timbers affected by dry and wet rot. This will involve replacement of structural timbers and original joinery as necessary and as described in the planning documents and drawings. The two-storey extension to the rear will comprise a Kitchen/Living/Dining area at garden level and additional bedroom / office to upper ground floor level, with 2 no. rooflights to the lower roof level. With all associated site works above and below ground. 56 Palmersto

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 290 m².

Planning reference 3739/21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.