Protected structure · Co. Dublin
56 Palmerston Road, Rathmines, Dublin 6, D06 K2K4
Granted 7 Apr 2022 (final grant issued 19 May 2022)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 6 by email
Key facts
- Planning application 3739/21 at 56 Palmerston Road, Rathmines, Dublin 6, D06 K2K4: Remodel and extension of an existing three-storey terraced house…
- It was received by Dublin City Council on 21 Oct 2021.
- Status: Granted 7 Apr 2022 (final grant issued 19 May 2022).
- Work was due to start on 30 Jan 2023, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 6 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 7 Apr 2022.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Remodel and extension of an existing three-storey terraced house…
PROTECTED STRUCTURE: The development will consist of: The remodel and extension of an existing three-storey terraced house with two-storey rear return. The works include for the provision of a 50 m² two-storey extension to the rear. Works to the existing house include; Garden Level: Removal of section of rear wall, modifications to layout of hallway, removal of building fabric to form new opening between front and rear primary rooms, modifications to rear return door ope to garden. Upper Ground Floor Level: modification of existing opening at rear wall of main house to the rear return, removal of building fabric to form a new ope to rear wall of rear return, removal of non-original partitions in primary rooms, removal of non- original bathroom at rear return. First Floor Level: removal of existing partition walls, the provision of 2 no. en suite bathrooms. Attic Level: removal of non-original window to attic half landing (rear) to facilitate reinstatement of original string course, new partitions to attic to provide office space and storage, 2 no. roof lights at attic level to be enlarged and the addition of 1 no. new rooflight (rear) External: Brick facade repointing (front), refurbishment of existing windows, reinstatement of cast iron railings, New vehicular access and parking space to rear. Fabric of the existing building: Due to the building suffering fire damage, subsequently not being watertight, and the building being unoccupied for many years there is significant dry and wet rot. Throughout all floors it will be necessary to replace any timbers affected by dry and wet rot. This will involve replacement of structural timbers and original joinery as necessary and as described in the planning documents and drawings. The two-storey extension to the rear will comprise a Kitchen/Living/Dining area at garden level and additional bedroom / office to upper ground floor level, with 2 no. rooflights to the lower roof level. With all associated site works above and below ground. 56 Palmerston Road is a protected structure.
- Location
- Dublin 6, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3739/21
Numbers and dates
- Floor area
- 50 m²
- Project type
- Protected structure
- Received
- 21 Oct 2021
- Decision to grant
- 7 Apr 2022
- Final grant
- 19 May 2022
- Site start notified
- 30 Jan 2023
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 3739/21.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 30 Jan 2023Notice filed · The development will consist of: The remodel and extension of an existing three-storey...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.