Site start

Commercial site start — Dublin

Dublin 2, Dublin

1 commencement notice · start date 13 Mar 2020 · planning reference given

Planning 2167/19 · Planning application

View full project timeline

Commencement notices
1
Latest start date
13 Mar 2020
Latest notice
93 m²
Planning reference
2167/19
Location
5 Dame Lane, Dublin 2

Location

Where the site is

Area
Dublin 2, Dublin
County
Dublin

Addresses on the notices

  • 5 Dame Lane, Dublin 2
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Material Change Of Use: Change Of Use to an Area of Ground Floor Only (93.0m2) From a Combination of Office and Retail to an Area of Assembly and Recreation. This Will also Include Material Alterations (Redesign of Internal Layout) to the Existing Offices.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 93 m².

Planning reference 2167/19

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.