Protected structure · Co. Dublin
Fumbally Exchange, 5, Dame Lane, Dublin 2
Granted 24 May 2019 (final grant issued 3 Jul 2019)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 2 by email
Key facts
- Planning application 2167/19 at Fumbally Exchange, 5, Dame Lane, Dublin 2: Change of use of part of the ground floor.
- It was received by Dublin City Council on 1 Feb 2019.
- Status: Granted 24 May 2019 (final grant issued 3 Jul 2019).
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 2 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 24 May 2019.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Change of use of part of the ground floor
PROTECTED STRUCTURE: The proposed development comprises a change of use of part of the ground floor (approximately 44 sq.m in area) of the building from retail / shop to office use together with the refurbishment of the building and internal and external alterations to the building. Internal alterations to the building are proposed to include the reconfiguration of the lift- / stair- and services core from basement through to third floor level. A reconfiguration of the basement level layout to include the provision of 2 no. car parking spaces; 25 no. bicycle storage spaces; revised plant layout; bin store provision together with the provision of ancillary staff facilities to include male and female WCs and shower / changing rooms plus a wheelchair accessible WC. Removal and rearrangement of partitions throughout the building at ground to third floor level to provide revised floor layouts, including revised lift- / stair- and services core. In addition to male and female WCs at ground to third floor levels a wheelchair accessible WC is also provided on each floor. Non-original fabric and alterations to the building, including fittings, fixtures, partitions and suspended ceilings are proposed to be removed to reveal the original Hennebique concrete structure throughout the new internal office fit-out. Proposed external alterations and works of refurbishment and enhancement include the provision of a platform lift to the front steps; removal of all existing windows and installation of new windows throughout, and the removal of existing plant and the provision of new external plant to the rear of the building at ground floor level. Other external alterations include the removal of the structural braces to the south-west, rear corner of the building and the removal of an existing external, metal fire escape stairs to the south-west corner of the building and the provision of a new, weather proofed replacement metal fire escape stair. The replacement stair will continue to provide a means of escape from the adjoining Hely Building and will also combine at the lower level with the external escape stairs serving the nearby Dame Court Building to the south-west. A new internal drainage system is proposed together with all associated site works.
- Location
- Dublin 2, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 2167/19
Numbers and dates
- Floor area
- 44 m²
- Project type
- Protected structure
- Received
- 1 Feb 2019
- Decision to grant
- 24 May 2019
- Final grant
- 3 Jul 2019
- Site start notified
- 13 Mar 2020
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 2167/19.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 13 Mar 2020Notice filed · Material Change Of Use: Change Of Use to an Area of Ground Floor Only (93.0m2) From a...View the site start
- Completion certificate recordedRecorded in Mar 2020 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area