Site start
Building extension site start — Tralee
Tralee, Kerry
1 commencement notice · start date 04 Feb 2020 · planning reference given
Planning 19/143 · Council file · external
- Commencement notices
- 1
- Latest start date
- 04 Feb 2020
- Latest notice
- 1 unit
- Planning reference
- 19/143
- Location
- Tralee, Kerry
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 19/143 Kerry County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Tralee, Kerry
- County
- Kerry
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kerry County Council planning record Application details, status and decision record for 19/143. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
REFURBISH AND EXTEND EXISTING COTTAGE. DEMOLISH EXISTING DINING/BATHROOM AND BOILER TO REAR, REPLACE FRONT DOOR WITH NEW WINDOW AND OTHER ANCILLARY ELEVATIONAL CHANGES, CONSTRUCT NEW PITCHED ROOF EXTENSION TO THE SOUTH WITH A FLAT ROOF LINK IN BETWEEN INCORPORATING ADDITIONAL LIVING SPACE/PLAYROOM/UTILITY AND BATHROOM, BUILD NEW REAR BOUNDARY WALL AND ENTRANCE, DECOMMISSION AND REMOVE EXISTING SEPTIC TANK / SOAKAWAY AND REPLACE WITH NEW WASTEWATER TREATMENT UNIT AND POLISHING FILTER COMPLETE WITH ALL ANCILLARY SITE WORKS ASSOCIATED WITH THE DEVELOPMENT AND RETENTION PERMISSION TO RETAIN EXISTING GARAGE/SHED AS BUILT ON SITE
Floor area stated for this source: 136 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.