Site start
Site start — Nenagh
Nenagh, Tipperary
1 commencement notice · start date 06 Oct 2014 · planning reference given
Planning 14/520006 · Council file · external
- Commencement notices
- 1
- Latest start date
- 06 Oct 2014
- Latest notice
- Scale not stated
- Planning reference
- 14/520006
- Location
- Nenagh, Tipperary
Location
Where the site is
- Area
- Nenagh, Tipperary
- County
- Tipperary
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
To carry out an upgrade to current milk process facilities: (a) the demolition of the current two-storey laboratory building and adjoining process building (b) the construction of a new process building incorporating an evaporator building and associated link into existing process area (c) associated site and drainage works all within existing dairy processing complex. This application relates to an activity for which an integrated pollution prevention control licence under the EPA Acts 1992 and 2011 is required and is held, no alteration to the existing licence is required.
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.