Site start
Commercial site start — Dublin
Dublin 1, Dublin
1 commencement notice · start date 16 Apr 2026 · planning references given
Planning 4554/23 (previous 3274/20) and RFI responses
- Commencement notices
- 1
- Latest start date
- 16 Apr 2026
- Latest notice
- 5,343 m²
- Planning references
- 3274/20 · 4554/23
- Location
- Dublin 1, Dublin
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The Bullitt Hotel development comprises the new build construction of hospitality and hotel accommodation over 8 storeys plus mezzanine, and the refurbishment and specialist fit out of existing buildings for hospitality including all associated infrastructure, utility works, amenities and external works, in Dublin 1. The main components comprise: - 97 bed hotel building with ground floor food and beverage facilities, which is comprised of two existing protected structures refurbished and linked by a new build structure, and rises up to Level 07 from within the main existing protected structure. Ground floor incorporates internal substation and switch room. - 2-storey & mezz. refurbishment and fitout of a protected monument (Meeting House) with a new build extension to provide Food and Beverage facilities. - 1-storey refurbishment and fitout of a protected structure (Bakehouse) with new build extensions to provide Food and Beverage facilities and bin store. - external covered entrance route onto Capel St. and external courtyard spaces.
Floor area stated for this source: 5,343 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.