Commencement notice group
Building extension commencement notices — Maynooth
Maynooth, Kildare
1 unique commencement event · latest notified commencement 29 Sep 2023 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 29 Sep 2023
- Latest notice
- 1 unit
- Planning references supplied
- 21/1375
- Public location
- Maynooth, Kildare
Public source geography
Site location
- Public site / locality
- Maynooth, Kildare
- County
- Kildare
Public site labels seen across the notices
- first floor level
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 21/1375. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of; 1) Removal of existing ground floor roofs, 2) a new front porch, 3) an extension to the side of the property at first floor level. This extension to accommodate two bedrooms, 4) an extension (part two storey) to the rear elevation. This extension to accommodate dining space, 5) altering the existing hipped roof to an apex roof with gable. New roof to have new skylights to the rear elevation, and new windows in new side gable, 6) an attic to be used as a dry storage area, 7) widening the existing driveway entrance. There will also be internal modifications, and all associated site works.
Floor area stated for this source: 171 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.