Commencement notice group
Building extension commencement notices — Dublin
Dublin 6, Dublin
1 unique commencement event · latest notified commencement 14 Sep 2026 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 14 Sep 2026
- Latest notice
- 374 m²
- Planning references supplied
- None stated
- Public location
- Dublin 6, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 6, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The development will consist of alterations to previously approved Grant of Permission (Reg. Ref. 4173/21) as follows: LOWER GROUND FLOOR: • Relocation of approved kitchen location from rear to front with associated services installations; • New opening in non-original blockwork partition to facilitate kitchen units and infill / relocation of existing door opening within adjacent pantry room; • Alterations to approved partitions / layout within utility / bathroom areas; • Alteration to approved position of External Storage (west) wall and rebuilding of the non-original walls and roof enclosing the entrance lobby all to the front / side; PIANO NOBILE (MAIN ENTRANCE) FLOOR: • Omission of approved w.c. / study and partitions within side extension; • Reinstatement of hall toilet and removal of modern stepped access into side extension and relocation to rear office space gallery; FIRST FLOOR: • Omission of approved family bathroom within side extension; • Omission of approved layout alterations to existing bathroom and omission of approved bedroom / lobby layout; • Omission of approved upper landing alterations to retain existing landing w.c.; • Removal of floor structure, steps and ceiling in bedroom within non-original side extension and reinstatement at higher level to eliminate stepped access; Related alterations to non-original window openings at first floor (front and rear) and joinery to suit new levels; To include all associated conservation works to joinery / plasterwork features throughout, service upgrades to affected works areas, site, landscaping and drainage works.
Floor area stated for this source: 374 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.