Commencement notice group

the IDA Business & Technology Park Garrycastle — commencement notices

Athlone, Westmeath

2 unique commencement events · latest notified commencement 25 Jul 2023 · planning reference supplied

View full project timeline

Unique commencement events
2
Latest notified commencement
25 Jul 2023
Latest notice
1,467 m²
Planning references supplied
22/60049
Public location
Athlone, Westmeath

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
1
  1. Completion certificate recorded — source scope not stated Westmeath County Council · commencement CN0103832WH Certificate CC00000047683WH · First observed in the official monthly source 2023-07 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Athlone, Westmeath
County
Westmeath

Notice location variants

  • the IDA Business & Technology Park Garrycastle, Athlone CN0103832WH, CN0099990WH
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Westmeath County Council planning record Application details, status and decision record for 22/60049. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0103832WH BCMS open-data feed

The development comprises of an IDA Athlone Regional HQ Refurbishment of circa 1,467 sq m situated at the IDA Business & Technology Park Garrycastle, Athlone. The renovation and fit-out works consist of: 1. Provision of new solar photovoltaic panels on the south facing roof of the building. 2. Provision of 2 no. new dormer louvres to north facing roof of building. 3. Provision of a new door on the south façade of the building, in place of an existing window ope. 4. Provision of a new 10-bike cycle shelter. 5. Provision of a new smoking shelter. 6. Provision of a new external seating area. 7. Provision of a new e-car charging point. 8. Provision of revised external lighting layout. 9. Revisions to existing M&E Plant compound. 10. It is proposed to replace all the existing windows in the building, and curtain walling at the main entrance, with new windows and curtain walling to match existing. This Commencement Notice involves the works for item no. 1 & 3 above only. All other works are covered under Commencement Notice ref. CN0099990WH.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,467 m².

Planning reference 22/60049
CN0099990WH BCMS open-data feed

The development comprises of an IDA Athlone Regional HQ Refurbishment of circa 1,467 sq m situated at the IDA Business & Technology Park Garrycastle, Athlone. The renovation and fit-out works consist of: 1. Provision of new solar photovoltaic panels on the south facing roof of the building. 2. Provision of 2 no. new dormer louvres to north facing roof of building. 3. Provision of a new door on the south façade of the building, in place of an existing window ope. 4. Provision of a new 10-bike cycle shelter. 5. Provision of a new smoking shelter. 6. Provision of a new external seating area. 7. Provision of a new e-car charging point. 8. Provision of revised external lighting layout. 9. Revisions to existing M&E Plant compound. 10. It is proposed to replace all the existing windows in the building, and curtain walling at the main entrance, with new windows and curtain walling to match existing. This Commencement Notice will not involve the works for item no. 1 & 3 above. These works are subject to Fire Safety Certificate approval and a further Commencement Notice / 7 Day Notice will be submitted for this portion of the works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,467 m².

Planning reference 22/60049

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.