Site start

Site start — Nenagh

Nenagh, Tipperary

1 commencement notice · start date 22 Apr 2026 · planning reference given

Planning 2560289 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
22 Apr 2026
Latest notice
491 m²
Planning reference
2560289
Location
Kenyon Street, Nenagh, Tipperary

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Nenagh, Tipperary
County
Tipperary

Addresses on the notices

  • Kenyon Street, Nenagh, Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Tipperary County Council planning record Application details, status and decision record for 2560289. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

a) demolition of single storey entrance lobby, single storey stores and two storey stores to the East elevation, b) revised shopfront to Kenyon Street (West Elevation) to include new shopfront, signage and glazing at ground floor level, window replacement at first and second floor levels and revised lighting, c) revised shopfront to Abbey Street (North Elevation) with associated signage and glazing, d) revised rear (East) elevation to provide new shopfront, wall finishes, glazing and associated signage, e) internal alterations to accommodate new retail fitout at ground floor level and ancillary areas at first floor level, f) installation of external plant area at roof level, g) revised car parking layout, construction of low-level wall with railing above along the Northern boundary, installation of Deposit Return Scheme Unit and all associated ancillary site and drainage works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 491 m².

Planning reference 2560289 Developer stated: Cedarglade ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.