Commencement notice group

Building extension commencement notices — Nenagh

Nenagh, Tipperary

1 unique commencement event · latest notified commencement 30 May 2025 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
30 May 2025
Latest notice
12 m²
Planning references supplied
2461064
Public location
Nenagh, Tipperary

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Nenagh, Tipperary
County
Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Tipperary County Council planning record Application details, status and decision record for 2461064. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The works carried out under this application are as follows - construction of new drive thru hatch and drive thru lane, extension to existing emergency & general lighting, extension of existing fire alarm, laying of floor finishes, erection of internal stud wall partitions, installation of prefabricated feature joinery items such as balustrades, coffee counter etc, internal decoration.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 12 m².

Planning reference 2461064

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.