Site start

Site start — (bounded by Parnell Street

Dublin 1, Dublin

2 commencement notices · latest start date 30 Oct 2019 · planning reference given

Planning 3334/17

Commencement notices
2
Latest start date
30 Oct 2019
Latest notice
1,500 m²
Planning reference
3334/17
Location
5-8 Parnell Street, Dublin 1

Location

Where the site is

Area
Dublin 1, Dublin
County
Dublin

Addresses on the notices

  • 5-8 Parnell Street, Dublin 1
  • Units 5, 6, 7 & 8, (bounded by Parnell Street, King's Inn Street and Loftus Lane), Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Phase 2 of a material alteration and change of use to construct a new microbrewery and visitor centre at 5/6 & 7/8 Parnell Centre, Dublin 1. This phase consist of the fit out and installation of plant and equipment and associated works within the units and common areas. This is a follow on from (commencement notice 8416225)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,500 m².

Planning reference 3334/17 Developer stated: Dublin Beer Factory Holdings Ltd
Notice 2 Commencement notice

PHASE 1 of a material alteration and change of use to construct a new microbrewery & visitor centre at 5/6 & 7/8 Parnell Centre, Dublin 1. This phase consist of modifcations to the existing below ground drainage, floor levels and associated works within the units and common areas in the demise of the Parnell Centre. Planning permission with grant order nos P3033 & P3549 are applicable to the entire development. An effluent discharge license, Ref no 916889 has been applied for this development.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,382 m².

Planning reference 3334/17

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.