Commencement notice group
first floor North of the existing PE hall — commencement notices
Lucan, Dublin
1 unique commencement event · latest notified commencement 07 Sep 2022 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 07 Sep 2022
- Latest notice
- 11,204 m²
- Planning references supplied
- SD16A/0072/EP
- Public location
- Lucan, Dublin
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 3
- Open exact official planning record: SD16A/0072/EP South Dublin County Council
- Partial completion certificate recorded South Dublin County Council · commencement CN0093191SD Certificate CC00000047973SD · First observed in the official monthly source 2022-09 1 units stated for this certificate · One certificate representation
- Partial completion certificate recorded South Dublin County Council · commencement CN0093191SD Certificate CC00000051253SD · First observed in the official monthly source 2022-09 1 units stated for this certificate · One certificate representation
- Partial completion certificate recorded South Dublin County Council · commencement CN0093191SD Certificate CC00000052909SD · First observed in the official monthly source 2022-09 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Lucan, Dublin
- County
- Dublin
Notice location variants
- first floor North of the existing PE hall CN0093191SD
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD16A/0072/EP. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1); Demolition of existing single and two storey Post Primary school buildings (1050sqm) to the East of the main school buildings. (2); Construction of a part two, part three storey Post Primary School extension (3346sqm in total) configured as follows: a); Three storey extension (1817sqm) North of main school building along the Lucan Road forming new Post Primary School pedestrian entrance off the Lucan Road, b); Two storey extension (1340sqm) to East of main school buildings, c); Two storey extension (escape stairs 55sqm) to the South of main school buildings on the West side of the two storey classroom block, d); Single storey extension (133sqm) at first floor North of the existing PE hall. (3); Reconfiguration of the existing vehicular and pedestrian access off Lucan Heights to form the main Post Primary school vehicular entrance and Secondary pedestrian entrance. (4); The reconfiguration of the existing Primary school pedestrian entrance in it’s current location off the Lucan Road and the re-designation of the existing Post Primary school vehicular entrance as the Primary school vehicular entrance. (5); All associated site works and landscaping. All at St Joseph’s College, Post Primary School and Scoil Mhuire Girls National School, Lucan Road, Lucan, Co. Dublin.
Floor area stated for this source: 11,204 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.