Site start

11,204 m² school building, Lucan

Lucan, Dublin

1 commencement notice · start date 07 Sep 2022 · planning reference given

Planning SD16A/0072/EP · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
07 Sep 2022
Latest notice
11,204 m²
Planning reference
SD16A/0072/EP
Location
Lucan, Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
3
  1. Partial completion certificate recorded South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-09 1 units stated for this certificate · One certificate representation
  2. Partial completion certificate recorded South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-09 1 units stated for this certificate · One certificate representation
  3. Partial completion certificate recorded South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-09 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Lucan, Dublin
County
Dublin

Addresses on the notices

  • first floor North of the existing PE hall
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD16A/0072/EP. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

(1); Demolition of existing single and two storey Post Primary school buildings (1050sqm) to the East of the main school buildings. (2); Construction of a part two, part three storey Post Primary School extension (3346sqm in total) configured as follows: a); Three storey extension (1817sqm) North of main school building along the Lucan Road forming new Post Primary School pedestrian entrance off the Lucan Road, b); Two storey extension (1340sqm) to East of main school buildings, c); Two storey extension (escape stairs 55sqm) to the South of main school buildings on the West side of the two storey classroom block, d); Single storey extension (133sqm) at first floor North of the existing PE hall. (3); Reconfiguration of the existing vehicular and pedestrian access off Lucan Heights to form the main Post Primary school vehicular entrance and Secondary pedestrian entrance. (4); The reconfiguration of the existing Primary school pedestrian entrance in it’s current location off the Lucan Road and the re-designation of the existing Post Primary school vehicular entrance as the Primary school vehicular entrance. (5); All associated site works and landscaping. All at St Joseph’s College, Post Primary School and Scoil Mhuire Girls National School, Lucan Road, Lucan, Co. Dublin.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 11,204 m².

Planning reference SD16A/0072/EP

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.