Commencement notice group
Housing commencement notices — Lucan
Lucan, Dublin
5 unique commencement events · latest notified commencement 08 Jul 2026 · planning reference supplied
- Unique commencement events
- 5
- Latest notified commencement
- 08 Jul 2026
- Latest notice
- 16 units
- Planning references supplied
- SDZ20A/0020
- Public location
- Lucan, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Major-project dossier · Wave 4 · W4-E065 · Batch 3
Reviewed planning, commencement and document evidence
Source-backed scopeHousing commencement notices — Lucan
Planning scope and commencement-event scale are retained as separate evidence; this label is not expanded into unreviewed works.
- Commencement identities
- 4 retained separately
- Latest group date
- 18 May 2026 not assigned across events
- Maximum on one notice
- 111 units never summed
- Reviewed index
- 0 0 exact document links
Planning and appeal references
- Planning SDZ20A/0020 Open exact official record
Supplier screening cues
- Residential scale screening cueMaximum stated scale on one retained notice: 111 units.
- Built-area screening cueMaximum stated floor area on one retained notice: 7802.7 m².
- Multi-event delivery screening cue4 distinct commencement identities are retained; they are not combined into a single scale.
Every retained commencement event
- Date not stated CN0141953SD Official public source URL unavailable in the reviewed projection
- Date not stated CN0139979SD Official public source URL unavailable in the reviewed projection
- Date not stated CN0138972SD Official public source URL unavailable in the reviewed projection
- Date not stated CN0135921SD Official public source URL unavailable in the reviewed projection
Exact organisation roles
- South Dublin County CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
Source limitations and event boundary
Reviewed snapshot differs from current group. The dossier remains tied to its checked snapshot. Current and reviewed event identities are kept separate rather than merged.
- The public evidence source provides a project label, references, group-level maxima and a reviewed document extract; it does not provide a full permission description for this dossier.
- Planning and appeal event dates are unavailable in the reviewed public source and are not inferred.
- Organisation coverage is limited to the responsible planning authority and, where an appeal reference exists, An Coimisiún Pleanála; no supplier appointment is claimed.
- Reviewed public index extract; this is not asserted to be the complete authority file.
- The reviewed source supplies only the latest group commencement date and group maxima, so values are not assigned to individual events and are never summed.
- No exact official planning or appeal case identity is present in the reviewed evidence.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Lucan, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of Block 1 Consisting of 16 No. Unit 4 storey apartment block
Floor area stated for this source: 1,324 m².
Construction of Blocks 3 consisting of 11 no units.
Floor area stated for this source: 1,222 m².
Source unit value with scope not stated: 111 units. It is not presented as notice-specific scale.
Construction of Blocks 2 consisting of 12 residential units.
Floor area stated for this source: 1,089 m².
Source unit value with scope not stated: 111 units. It is not presented as notice-specific scale.
Construction of 3 residential units Consiting within Block 14
Floor area stated for this source: 289 m².
Source unit value with scope not stated: 111 units. It is not presented as notice-specific scale.
Construction of 69 residential dwelling units (Houses) consisting within Blocks 4-20
Floor area stated for this source: 7,803 m².
Source unit value with scope not stated: 111 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.