Site start · Co. Dublin
Lucan, Dublin
Site start 21 Nov 2025
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
Search the South Dublin planning registerCurrent planning applications in Lucan
What and where
113 homes
Demolition of 3 existing dwelling houses in addition to 9 farm structures and outbuildings and the construction of 113 residential units comprising 70 two storey dwelling houses (comprising 61 three bed units and 9 four bed units ranging in size from 109sq.m to 148sq.m); 30 duplex units (comprising 16 two bed units and 14 three bed units ranging in size from 94sq.m to 110sq.m) and 13 apartments (comprising 8 one bed units and 5 two bed units ranging in size from 50sq.m to 73sq.m); duplexes and apartments will be accommodated in 3 four storey blocks which will include balconies/terraces facing north-west and south-east; the development will consist of the demolition of 4,701sq.m of existing gross floor area (730sq.m habitable and 3,971sq.m non-habitable) and the construction of 11,917sq.m gross floor area; vehicular access from the subject lands to Adamstown Way to the south and to Tandy's Lane to the north; a vehicular connection will also be provided to the north-western boundary of the site to allow for a future vehicular connection to Adamstown Park (pending the future development of adjacent third party lands to the north-west); internal routes including new north-south avenues linking Tandy's Lane with Adamstown Way and an east-west avenue which will link to Adamstown Park (pending the future development of adjacent lands); pedestrian connections from the subject lands to Adamstown Park along Tandy's Lane and to Adamstown Way; 145 car parking spaces including on-curtilage and on-street spaces; bicycle parking; bin storage; plant; sedum roofs; solar/photovoltaic panels; boundary treatments; lighting; hard and soft landscaping including 833sq.m public open space and 737sq.m communal open space; changes in levels and all other associated site works above and below ground on lands on a 2.41 Ha site at Tandy's Lane incorporating the dwelling's Carrig (Eircode K78 D348), Coolmore (Eircode K78 XH33) and an unnamed dwelling (Eircode K78 X780) all at Tandy's Lane and are bounded generally to the north-east by Tandy's Lane (with Tandy's Lane Park beyond) to the south-east by Finnstown House Hotel (Protected Structure) and to the south-west and north-west by undeveloped lands; Adamstown Way is located further to the south and Adamstown Park is located further to the west; the application is made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to a proposed development with the Adamstown Strategic Development Zone with lands located within the St. Helen's Development Area.
- Location
- Lucan, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SDZ20A/0020
- Applicant
- Rycroft Homes
- Agent
- Rycroft Homes
Key facts
- Homes
- 113
- Floor area
- 11,917 m²
- Estimated construction value
- €20m to €37mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Site start
- 21 Nov 2025
- Protected structure
- Yes
Documents and evidence
Check the record
- Council planning fileThe application file SDZ20A/0020 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 21 Nov 2025Work started · phase 1 · Construction of 69 residential dwelling units (Houses) consisting within Blocks 4-20
- 27 Feb 2026Work started · phase 2 · Construction of 3 residential units Consiting within Block 14
- 27 Mar 2026Work started · phase 3 · Construction of Blocks 2 consisting of 12 residential units
- 18 May 2026Work started · phase 4 · Construction of Blocks 3 consisting of 11 no units
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.