Commencement notice group
Building extension commencement notices — Dublin
Dublin, Dublin
1 unique commencement event · latest notified commencement 24 Jun 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 24 Jun 2026
- Latest notice
- 1 house
- Planning references supplied
- D26B/0124/WEB
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Park Lodge will consists of : The development will consist of: 2
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development at Park Lodge will consists of : The development will consist of: 2.) Works to the external stairs to the front to include stone cladding over the existing steps, handrails to both sides and completion of the structure under the stairs to accommodate new bathroom, with windows to both sides. 3.) New entrance door with top and side lights to the front facade at first floor. 4.) Removal of the archway and addition of new entrance door with canopy over to the front facade at ground floor. New window to the rear at first floor. 5.) Alterations to the side elevation of the original house to include the replacement of the ground floor doors with windows . Removal of all roof lights from the main roof. 6.) Demolition of the ground and first floor partially complete structure to the rear and replacement with a new ground and first floor rear extension with roof light. 7.) Renovation of the interior and exterior of the original house. 8.) General site works including landscaping and associated site works.
Floor area stated for this source: 365 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.