Site start

Commercial site start — Farranrory

Farranrory, Tipperary

1 commencement notice · start date 31 Mar 2025 · planning reference given

Planning 20972 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
31 Mar 2025
Latest notice
81 m²
Planning reference
20972
Location
Coolnashinnagh, Farranrory, Tipperary

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Completion certificate validated Tipperary County Council · commencement notice Completion certificate · Certificate validation date 2026-08-27 See official certificate for completed works · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Farranrory, Tipperary
County
Tipperary

Addresses on the notices

  • Coolnashinnagh, Farranrory, Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Tipperary County Council planning record Application details, status and decision record for 20972. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Erection of a single storey, concrete block frame, 38 kV substation control building. The building is classified as industrial. This building will be used for the control of the electricity produced by the wind turbines entering the national grid as part of the Farranrory Wind Farm Development. The site is located in The Slieveardagh Hills, within the townlands Farranrory Upper, Farranrory Lower, Coolnashinnagh & Gortnasmuttaun, Ballingarry in Co. Tipperary.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 81 m².

Planning reference 20972 Developer stated: Orsted Onshore Ireland Midco Ltd