Commencement notice group
Commercial commencement notices — Dublin
Dublin 1, Dublin
2 unique commencement events · latest notified commencement 05 Sep 2018 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 05 Sep 2018
- Latest notice
- Scale not stated
- Planning references supplied
- None stated
- Public location
- Dublin 1, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 1, Dublin
- County
- Dublin
Notice location variants
- Dublin CN0043427DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Removal of the outer block wall and replacement with a new rendered outer leaf block wall with cavity and insulation including minor modifications to new wall construction at east end of southern elevation at ground floor level, provision of new glazed screen & doors at ground floor, new glazed screen at first floor and enlarged glazed screen at second floor, new supply and extract louvres on south elevation to serve future cafe at ground level & new parapet detail with new balustrading and handrail at roof level & associated works incl rainwater goods at southern and part east elevation.
7-Day Notice - Works will comprise fit out of the existing office accommodation at Ground, 1st, 2nd & 3rd floor levels to provide private and collaborative open plan work space, meeting rooms and staff welfare facilities at each floor level; Provision of meeting rooms, yoga studio, security room, AXA lab, Male Female and Part M accesible toilet & shower accommodation and staff canteen at Ground Floor level; Installation of internal glazed and stud partitions and provision of mechanical ventilation & air-conditioning to the internal accommodation; Provision of new service installations & amendments to existing services; including internal waste, water and drainage, mechanical and electrical, fire alarm, emergency lighting general lighting & small power.
Floor area stated for this source: 4,600 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.