Site start
Parnell Square E, Rotunda, Dublin 1
Dublin
1 commencement notice · start date 05 Aug 2025 · planning reference given
Planning 4130/24 · Planning application
- Commencement notices
- 1
- Latest start date
- 05 Aug 2025
- Latest notice
- 203 m²
- Planning reference
- 4130/24
- Location
- Parnell Square E, Rotunda, Dublin 1
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- Parnell Square E, Rotunda, Dublin 1
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The Rotunda Hospital - Temporary Radiology Department, The application comprises the construction of a single storey building for a Temporary Radiology Department at the Rotunda Hospital campus at Parnell Square, Dublin 1. The temporary building will be located to the rear of the existing hospital building within and be connected via a new link corridor. The construction will be formed of a structural steel frame on an insulated structural concrete floor slab. The external walls will be formed of metal clad insulated sandwich panels.
Floor area stated for this source: 203 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.